Fat Lorenzo’s owner
concerned about safety along Cedar
by Tesha M. Christensen
In a few years, bicyclists will be able to hop on a trail and
ride from Lake Nokomis to the Minnesota River.
Portions of the 7-mile Intercity Regional Trail are slated
for construction in 2014. Right now, planners are accepting comments on the
design.
“The Intercity Regional Trail will expand opportunities for
safe recreation and commuting. It will provide convenient, off-street trail
connections to the Three Rivers Park District regional trail system via the
Nine Mile Creek Regional Trail (which is nearing completion), as well as to the
future state trail in the Minnesota River Valley. Trail users also will be able
to connect to the Mall of America,” said Jason McGrew-King of the Three Rivers
Park District.
The Intercity Regional Trail will begin on the south side of
Lake Nokomis, connecting the Minneapolis Ground Rounds trail system to the
Minnesota River in Dakota County through the cities of Minneapolis, Richfield,
and Bloomington.
Like the other regional trails operated by the Three Rivers
Park District, the Intercity Regional Trail will be a paved, multi-use trail
surface with mowed grass shoulders, according to McGrew-King. The majority of
the 10-foot-wide, asphalt trail parallel existing city streets.
“In Minneapolis, trail users will have good vantage points of
Lake Nokomis. Also in Minneapolis, Edward Solomon Park offers natural areas and
opportunities for passive recreation,” McGrew-King pointed out. “Taft Park in
Richfield offers a great deal of recreational opportunities, and Taft Lake will
be undergoing significant water quality improvements. In Bloomington, the trail
also will travel near Wright’s Lake Park. Further south, the trail will provide
views of the Minnesota River Valley.”
In some areas, the trail will travel through an urban
environment and will provide access to employment centers, shopping and
restaurants, and will offer connections to mass transit, McGrew-King added.
There will be rest stops every mile.
FEDERAL
FUNDS WILL HELP PAY FOR CONSTRUCTION
Most of the trail is not yet constructed, although there are
a few pieces already in place. Work will begin on 3.8 miles between Lake
Nokomis and the Mall of America in 2014, courtesy of a Federal Surface
Transportation Program grant in the amount of $5.5 million.
The trail segment between the Mall of America and Minnesota
River will be constructed as resources are available and when the Minnesota
Valley State Trail or a feasible and acceptable crossing of Long Meadow Pond is
complete.
It will cost $348,000 for the portion of the trail in
Minneapolis, which includes not only the cost of the trail but also that of
modifying Old Cedar and Edgewater Blvd. The total project will cost an
estimated $8,994,000, of which $630,000 is for right-of-way; the majority of
this tab will be paid by federal funds. The annual cost of maintenance for the
new section of trail will be about $817, and will come out of the Minneapolis
Parks and Recreation budget.
The bill did look larger for Minneapolis in the initial
planning process, when it was proposed to replace the pedestrian bridge on
Cedar to minimize vehicular conflicts and limit right-of-way. That option is no
longer on the table.
CHANGES
AT EDGEWATER AND OLD CEDAR
Changes in the area will affect how traffic moves. To make
the trail crossing shorter, Edgewater Blvd. will be narrowed at the Cedar Ave.
intersection to minimize the distance trail users will need to cross the street
and better define the roadway intersection for motorists.
The entrance to
Old Cedar Avenue from Cedar Avenue southbound will be reconfigured and will
include a longer deceleration lane. Old Cedar Avenue will remain one-way
southbound until 58th Street E. Old Cedar will be narrowed and one lane of
parking removed. This will create separate walking and trail facilities, and
include a 4-foot grass boulevard between the trail and sidewalk, adequate space
for snow storage and space for loading/unloading of parked vehicles on Cedar
Avenue.
NEIGHBORHOOD
CONCERNS
Fat Lorenzo’s owner Scott Siegel is skeptical that these
changes will make the area safe enough for bicyclists. “I don’t know why you’d
want to put a bike on Cedar,” he said. “I look at Cedar as a freeway. People
drive fast around here.”
Instead, Siegel thinks the trail should go down 16th Ave. S.
Siegel pointed out that Edgewater is a busy, uncontrolled
intersection, one at which he already sees bicyclists injured at on a regular
basis. ‘The reality is they’re not going to stop the cars,” Siegel said. He has
advocated for turning Edgewater into a cul-de-sac to help solve some of the
traffic woes. Siegel wishes that the parks department will convert the open
space between Edgewater and the Lake Nokomis Parkway into a parking lot.
He noted that people use Old Cedar and Edgewater more than
the parkway, both for travel and parking. Siegel is concerned about removing
one lane of parking on Old Cedar, pointing out it will not only affect his
customers and attendees at Hope Lutheran Church, but also those who use the
existing trails around Lake Nokomis.
As proposed, the trail will mean that half the sidewalk in
front of his door will be taken away. Access into his business and space for
outdoor seating is a major concern for Siegel.
He’s hoping for another neighborhood meeting at which to
address his concerns, and those he’s heard from other residents. “I don’t think
there’s a lot of neighborhood support,” Siegel stated.
COMMENT
ON THE PLAN
The public has the
opportunity to provide comments from April 2 through May 1; written comments
may be submitted by e-mail to ICRT@ThreeRiversParkDistrict.org, by fax to
763-557-5248, or by mail to: Three Rivers Park District, Intercity Regional
Trail, 3000 Xenium Lane N., Plymouth, MN 55441. Final trail design is expected
to begin in late fall or early winter.
This story printed in the May 2012 edition of the Longfellow/Nokomis Messenger.
No comments:
Post a Comment